Domain 1: Ground Source Heat Pump Benefits

Question 1

A homeowner asks why a ground source heat pump may reduce long-term energy use compared with a conventional air-source system. Which explanation best describes a primary benefit of a ground source heat pump?

Show answer & explanation

Correct answer: A - It uses stable ground temperatures as a heat exchange source, reducing dependence on outdoor air temperature swings

Domain 2: System Components

Question 2

During a residential geothermal design review, a designer explains that the heat pump is only one part of the complete system. Which component group is most directly associated with transferring heat between the ground loop and the building equipment?

Show answer & explanation

Correct answer: B - Ground heat exchanger, circulating pumps, and interior piping

Domain 3: Heat Pump Types

Question 3

A designer is selecting equipment for a residence where the available ground loop configuration differs from an open-water application. Which classification should the designer evaluate before selecting the heat pump system?

Show answer & explanation

Correct answer: A - Ground-source heat pump type and the characteristics of the heat exchange arrangement

Domain 4: Design Process

Question 4

A geothermal designer begins a new residential project. Which action should occur earliest in a sound design process?

Show answer & explanation

Correct answer: B - Determine building energy requirements and system loads before final equipment selection

Domain 5: Energy Requirements

Question 5

A residence has unusually high heating demand due to poor envelope performance. The geothermal designer should recognize that:

Show answer & explanation

Correct answer: B - Building energy requirements directly affect equipment sizing and system performance

Domain 6: Load Calculations

Question 6

A designer calculates a residential heating load before selecting a geothermal heat pump. Why is this calculation essential?

Show answer & explanation

Correct answer: A - It determines the required capacity so the system can match the building demand

Question 7

A designer is reviewing a load calculation and notices the calculated heating requirement is lower than the selected heat pump capacity by a large margin. What is the best interpretation?

Show answer & explanation

Correct answer: A - Oversizing may affect performance and should be evaluated against design requirements

Domain 7: Parameters that affect different types of heat pump performance, site, geology and soil conditions

Question 8

A proposed vertical loop installation is being evaluated. The site investigation finds different soil and geological conditions than expected. What is the most appropriate design consideration?

Show answer & explanation

Correct answer: B - Adjust design assumptions because geology and soil conditions influence heat transfer performance

Domain 8: Heat pump and pipe design

Question 9

A residential loop field has acceptable pipe length, but pumping requirements are higher than expected. Which design area should be reviewed most closely?

Show answer & explanation

Correct answer: A - Ground heat exchanger, pumping, and piping design parameters

Domain 9: Economics of design

Question 10

A homeowner compares two geothermal designs with different installation costs and expected operating savings. Which factor is the designer primarily evaluating?

Show answer & explanation

Correct answer: A - Economic performance of the design over its expected service period